The exciting new redevelopment of our Physiotherapy clinic started on the 1st June 2021. Our new clinic will include a complete facelift of the existing building and the construction of a Rehab Pod: a gym area with the latest equipment to assist patients in their rehabilitation and recovery. We are also introducing new rehab classes.
Classes will include:
Stretch
Pilates including floor and Reformer
Yoga
Aged balance and mobility
Rehab and maintenance classes – for patients who rehab better when they are part of a group or need encouragement!
Targeted classes for back, shoulder, and knee rehab.
How does it affect you in the short term?
Drury Physiotherapy will still be open throughout the construction process, which will be done in two stages. Stage 1 will see the construction of the new Rehab Pod building. Once that is completed, Stage 2 will start on the renovation the existing building. During Stage 2, we will use the new Rehab Pod building for a temporary reception area and treatment rooms.
Parking will be still available in the area between Great South Road and the existing building carpark.
Render designs of the new clinic redevelopment (c/o CTM Architectural Ltd)
https://jmarrphysio.co.nz/wp-content/uploads/2023/04/jmarr-physio-logo2023-30years.gif00Jeff Marrhttps://jmarrphysio.co.nz/wp-content/uploads/2023/04/jmarr-physio-logo2023-30years.gifJeff Marr2021-06-07 18:19:042021-06-07 18:30:32Take a look at our new clinic
Clinic Renovations – Update
Our new clinic is coming along nicely – check out the work that’s been going on.
Take a look at our new clinic
A new facility for our staff and patients!
The exciting new redevelopment of our Physiotherapy clinic started on the 1st June 2021. Our new clinic will include a complete facelift of the existing building and the construction of a Rehab Pod: a gym area with the latest equipment to assist patients in their rehabilitation and recovery. We are also introducing new rehab classes.
Classes will include:
How does it affect you in the short term?
Drury Physiotherapy will still be open throughout the construction process, which will be done in two stages. Stage 1 will see the construction of the new Rehab Pod building. Once that is completed, Stage 2 will start on the renovation the existing building. During Stage 2, we will use the new Rehab Pod building for a temporary reception area and treatment rooms.
Parking will be still available in the area between Great South Road and the existing building carpark.
Winter Sports Pre-Season Training
Desk Jockeys – Improve Thoracic Spine Mobility
Getting your winter sporting injuries sorted